Find The Best Nursing Paper Writers For Your Assignments

You Can order for custom written paper 24/7! by completig a form in 3 steps. Get those desired coursework assessment grades!

Posted: September 10th, 2023

VoIP Part 1 (Work Breakdown Structure) This assignment contains two (2) deliverables

VoIP Part 1 (Work Breakdown Structure)

This assignment contains two (2) deliverables: a summary document to be
delivered in a word processor document format and a Work Breakdown
Structure (WBS) to be delivered in a project file.

Overview
As the project manager for an IT department, you have been assigned to
manage the project of deploying a new VoIP phone system to the company’s
campus. The campus consists of three (3) different buildings, each with
twenty to fifty (20 to 50) workstations. The project must be completed
in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

1. Write a one to two (1-2) page summary document in which you:

a. Summarize the project requirements and other assumptions (e.g.,
budget, human resources, workload, environmental dependencies, etc.).

b. Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

2. Use Microsoft Project to create a WBS which:

a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.

b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.

c. Contains Work Breakdown Structure Code for each task.

d. Presents a duration estimate for each task which results in a
duration estimate for the project not to exceed the requirements
described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date.
The cover page and the reference page are not included in the required
assignment page length.

Write My Paper

Academic Paper Writing Help For You!

Get 20-25% Off On Your Order!

Why choose us

You Want Quality and That’s What We Deliver

Professional Writers

We assemble our team by selectively choosing highly skilled writers, each boasting specialized knowledge in specific subject areas and a robust background in academic writing

Discounted Prices

Our service is committed to delivering the finest writers at the most competitive rates, ensuring that affordability is balanced with uncompromising quality. Our pricing strategy is designed to be both fair and reasonable, standing out favorably against other writing services in the market.

AI & Plagiarism-Free

Rest assured, you'll never receive a product tainted by plagiarism or AI-generated content. Each paper is research-written by human writers, followed by a rigorous scanning process of the final draft before it's delivered to you, ensuring the content is entirely original and maintaining our unwavering commitment to providing plagiarism-free work.

How it works

When you decide to place an order with Nurscola, here is what happens: